WindSwept Designs USA
  • Home
  • Products
    • Flags
    • WindBands
    • SwingArm Trucks
  • Services
  • Contact Us
WindSwept Designs offers phone, email and site support to our customers.  Reach us using our Contact Us page.

WindBand Overview Video

WindBand Installation and Operation Videos

The following videos show you all the steps necessary to prepare the tower then install, operate and remove the WindBands.  You can also download the Installation and Operation Manual below.

WindBand Installation and Operation Manual

The Installation and Operation Manual is provided as a PDF for download for mobile viewing or printing.  Note that this manual may be updated periodically so make sure that you have the newest revision before using the PDF you have downloaded previously.
WindBand V3 Installation Operation Guide
Nello Tower Only - WindBand V3 Installation Operation Guide
Common WindBand Installation Mistakes

 WindBand Installation Verification Form Instructions

Instructions for filling out the WindBand Installation Verification Form (IVF) are included with each shipment of WindBands and can be downloaded below.  We recommend installers review the instructions before heading to the job site.
Windband Installation Verification Form Instructions (250243 Rev 01)

WindBand Installation Verification Form

An approved WindBand Installation Verification Form (IVF) insures the tower owner or tenant that their WindBands have been properly installed.  The IVF is a requirement of the installation and can be found at bit.ly/2AQrsI5 or clicking the button below.  The IVF is submitted electronically and requires the tower installer to take specific close-up photographs of the WindBand installation.  
WindBand Installation Verification Form (IVF)
Proudly powered by Weebly